Why do I have to pay the utility fee when I do not have ditches or stormwater drains on my street?
  • The stormwater utility fee is issued to any developed parcel within Town boundaries.
  • Developed parcels contribute to stormwater runoff that must be managed by the Town.
  • The Town is also responsible through the NPDES MS4 permit to continually reduce the amount of pollution (chemical, thermal, sediment) that enters the MS4.
  • The stormwater utility fee is not for direct contribution of stormwater from a parcel to the MS4, but rather for maintaining the Town's system as a whole to ensure that we are in compliance with our NPDES MS4 permit. 

Show All Answers

1. Can the Town choose not to participate in National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) program?
2. When did the Town adopt the post-construction stormwater ordinance?
3. When did the Town get its first NPDES permit?
4. How can I pay my stormwater utility bill?
5. Why do I have to pay the stormwater utility if I live on a NCDOT road?
6. Why do I have to pay the utility fee when I do not have ditches or stormwater drains on my street?
7. Do I have to comply with a post-construction stormwater permit? Can I be grandfathered?
8. Can I dig into a stream bed or stream bank or otherwise alter a stream or creek?